Case studies

What each client needed, what we delivered, and the result.

Case study · Larsen & Toubro

Ras Mohaisen Workmen Facility

Al Muzailif, Qunfudha

1,600Guests
210 daysTo build
60,000Man-hours without a lost-time injury
The challenge

The Larsen & Toubro project site at Al Muzailif is remote. The workforce needed a place to live close to the site.

Our scope

We built the complete camp for 1,600 guests. We operate and maintain the camp, and we cater for its guests.

Timeline

We built the full camp and handed it over in 210 days. The handover ceremony was on 24 January 2026.

Safety

We completed 60,000 man-hours on the build without a lost-time injury.

Contract value

SAR 26M for construction. SAR 70M for operation and catering.

The result

We handed over the full camp in 210 days. Today we operate the camp and cater for its guests.

The camp from the air Steel frames being assembled The kitchen and dining building A walkway between two accommodation blocks
Case study · NEOM Green Hydrogen Company

NEOM Camp

Duba

4,200Guests
240 daysTo build
18,000Meals a day
The challenge

NEOM was a new development, and its rules for workforce housing were strict. The camp had to meet those rules from the first day.

Our scope

We built the camp for 4,200 guests. We operate and maintain it, and we serve 18,000 meals a day.

Clients

NEOM Green Hydrogen Company, Air Products and Larsen & Toubro house their workforce in the camp.

Timeline

We built the camp in 240 days. It has been in operation since 2023.

Contract value

SAR 37M.

The result

We delivered the camp in 240 days, to the housing rules of NEOM. Today we operate and maintain it.

Accommodation blocks from the air The camp and its roads from the air Accommodation blocks and the bus park A street inside the camp
Case study · Our headquarters camp

Rabigh Camp

Rabigh

2,600Guests
21,000Meals a day
2008In operation since
The challenge

Our accommodation in Rabigh was spread over several locations. Rabigh is our headquarters, and it needed a better camp.

Our scope

We renovated the accommodation and combined the locations into one camp for 2,600 guests.

Clients

GS Inima, Anabeeb, AYTB, Schneider Electric, Carlo Gavazzi and Sulzer house their workforce in the camp.

Timeline

We have operated in Rabigh since 2008. We renovated and combined the camp in 2024.

Contract value

SAR 19M.

The result

One combined camp for 2,600 guests, running since 2024. We serve 21,000 meals a day.

The Rabigh camp from the air The renovation works from above The central yard of the camp The camp at sunset
Case study · Built, owned and operated by us

Jeddah Camp

Jeddah

3,200Guests
28,000Meals a day
2020Opened
The challenge

Jeddah is the city we visit most for purchasing. We expanded there to have a camp of our own in the city.

Our scope

We built the camp and we own it. We operate and maintain it, and we serve 28,000 meals a day.

Clients

Larsen & Toubro, SEPCO, China Railway, MAPA, Alfanar, CGGC and Al-Suwaidi house their workforce in the camp.

Timeline

The camp opened in 2020. We expanded it in 2023.

Contract value

SAR 27M.

The result

A camp for 3,200 guests, running since 2020 and expanded in 2023.

The Jeddah camp from the air Palm trees along the camp entrance The camp gate Accommodation blocks inside the camp
Contact

Request a proposal

Headcount, project location and start date are enough to begin. We reply within 24 hours.